Adaptation of the Riga tram infrastructure to the low-floor tram parameters
Continuing the implementation of the project “Adaptation of the Riga tram infrastructure to the low-floor tram parameters”, construction project development works have been started for the adaptation of the infrastructure of the tram route No. 5 and No. 7 line sections and the infrastructure at the intersection of 11 November Embankment and 13 January Street.
The project works will improve environmental accessibility for elderly people, passengers with children and people with special needs and in general will contribute to the increase of the number of passengers in environmentally friendly public transport. The project was started in 2021 and is expected to be completed by the end of 2023. It is planned to attract co-funding from the Eropean Union Cohesion fund to the project.
Works included in the project:
- Adaptation of the infrastructure of the tram route No. 5 in the section from the intersection of Slokas Street and Jūrmalas gatve to the final point “Iļģuciems” – approximately 2 km in total;
- Reconstruction and renewal of the infrastructure of the tram route No. 7 in the section from Centrāltirgus Street to the final point "Ķengarags" - approximately 7 km in total;
- Reconstruction and renewal of the tram infrastructure at the intersection of 11 November Embankment and 13 January Street.
Tram route No. 5:
- Construction, reconstruction and renewal of the energy supply facilities;
- Reconstruction and renewal of the rail tracks;
- Construction and reconstruction of the stop platforms.
Tram route No. 7:
- Construction, reconstruction and renewal of the energy supply facilities;
- Reconstruction and renewal of the rail tracks;
- Construction and reconstruction of the stop platforms;
- Installation and adaptation of the traffic light objects to improve the speed of the tram traffic;
- Measures to improve traffic safety.
The intersection of 11. novembra krastmala and 13. janvāra Street:
- Reconstruction of the rail tracks, including installation of automated switch control system;
- Adaptation of the tram catenary constructions;
- Rain water drainage solutions in the area of the rail track intersection;
- Construction of the road pavement for heavy traffic load.
The project has several environment sustainability-related objectives, including:
- reduction of the negative CO2 emission impact on the environment and air quality produced by private cars;
- reduction of the traffic jams;
- increase of the speed of the tram traffic;
- improvement of the experience of travelling in public transport by enhancing the quality of rendered service.
Benefits of the project implementation:
On tram routes No. 5 and No. 7:
- rebuilt and raised stop platforms with improved accessibility;
- faster tram movement and safer traffic;
- lower noise level;
- more neighbourhoods where low-tram traffic can be ensured.
In the intersection of 11. novembra krastmala and 13. janvāra Street:
- higher tram traffic safety in the switch area;
- less time for crossing the intersections, consequently less traffic jams;
- higher level of comfort when transport vehicles move across the rail track intersections;
- lower operating costs for pavement maintenance
The implementation of the designing works is planned with attracting co-financing of the European Union Cohesion Fund within the project "Adaptation of the Riga tram infrastructure to the low-floor tram parameters" (No. 4.5.1.1/22/I/001). Total costs of the project are estimated at 55.2 million euro, whereas, the Cohesion Fund co-financing amounts to 85% of the eligible costs of the project, i.e. 38.78 million euro.
Additional information:
Press news:
- Rīgas satiksme invests EUR 60 million in tram infrastructure renewal (14.11.2024)
- Video: The renovation works are now complete and the track of tram route 7 has been adapted for low-floor trams
- Low-floor tram starts running on tram route 7 (30.07.2024.)
- Video: Video: works on tram route 7 from Centrāltirgus street to the terminus "Ķengarags"
- The Reconstruction of Tram Route 7 Coming to a Close 16.05.2024.
- Tram Route 5 Once Again Runs to Iļģuciems 28.02.2024.
- Reconstruction of tracks and overpasses at the intersection of 11. novembra krastmala and 13. janvāra iela has been completed 03.11.2023.
- Construction works have started on the section of tram route 7 from Centrāltirgus iela to the final destination Ķengarags, 30.05.2023.
- From 6 March, the course of route 1, 2, 5 and 10 trams will be changed at the intersection of 11. novembra krastmala and 13. janvāra iela 02.06.2023
- The adaptation of the infrastructure section of tram route 7 to the parameters of a low-floor tram will be carried out by SIA Binders, 28.04.2023.
- The adaptation of the infrastructure section of route 5 tram to the parameters of a low-floor tram will be carried out by the Joint Stock Company (AS) A.C.B., 14.03.2023.
- Rīgas satiksme to start reconstruction of tracks and overpasses at the intersection of 11. novembra krastmala and 13. janvāra iela, 08.02.2023.
- The intersection of 11. novembra krastmala and 13. janvāra iela will be adapted to the low floor tram parameters by SIA “Binders”, 06.12.2022.
- An agreement has been signed for co-financing of one of the largest tram infrastructure renewal projects of “Rīgas satiksme”, 09.08.2022.
- An event informing the public about the construction projects developed by “Rīgas satiksme” on tram route No. 5 and 7 has taken place, 17.06.2022.
- “Rīgas satiksme” announces procurements for the performance of construction works at the line sections of tram No. 5 and No. 7, 21.03.2022.
- Work on implementation of the project “Adaptation of the Riga tram infrastructure to the low-floor tram parameters” is being continued, 30.12.2021.
- An open tender for the purchase of electrical equipment for substations has been announced, 30.12.2021.
- Construction project development works have been started for the adaptation of the infrastructure at the intersection of 11 November Embankment and 13 January Street to the low-floor tram parameters, 10.09.2021.
- Construction project development works have been started for the adaptation of the infrastructure of the tram route No. 7 line section to the low-floor tram parameters, 10.09.2021.
- Construction project development works have been started for the adaptation of the infrastructure of the tram route No. 5 line section to the low-floor tram parameters, 09.09.2021.
- “Rīgas satiksme” announced an open tender for the development of a construction project for the adaptation of the infrastructure of the tram route No. 5 to the low-floor tram parameters, 21.04.2021.
- "Rīgas satiksme" announced an open tender for the development of a construction project for the adaptation of the infrastructure of tram route No. 7 to the low-floor tram parameters, 06.04.2021.
- “Rīgas satiksme” has filed an application with the Central Finance and Contracting Agency to raise co-funding from the European Union for the development of Riga tramway infrastructure, 29.03.2021.
- “Rīgas satiksme” will apply for European Union co-funding for the purpose of modernization of the Riga tram infrastructure, 10.04.2021.
Procurements:
- Procurement procedure “Provision of construction supervision for the project “Reconstruction of the building of Substation 17, Aviācijas iela 1C and replacement of electrical equipment””
- Procurement procedure “Reconstruction of the building of Substation 17, Aviācijas iela 1C and replacement of electrical equipment”
- Procurement procedure “Provision of construction supervision in the facility “Reconstruction of the building of Substation 16 at Slokas iela 54B, restoration of the 10kV power line and replacement of electrical equipment””
- Procurement procedure “Reconstruction of the building of Substation 16 at Slokas iela 54B, restoration of the 10kV power line and replacement of electrical equipment””
- Procurement procedure "Provision of construction supervision in the facility “Demolition of the building and construction of the Substation 13 at Fridriķa iela 2, restoration of the 10kV power line and replacement of electrical equipment””
- Procurement procedure “Demolition of the building and construction of the Substation 13 at Fridriķa iela 2, restoration of the 10kV power line and installation of electrical equipment””
- Procurement procedure "Provision of construction supervision for the project "Rebuilding and replacement of electrical equipment of the 11th substation building at Ķengaraga iela 3A""
- Procurement Procedure “Rebuilding and replacement of electrical equipment of the 11th substation building at Ķengaraga iela 3A”
- Procurement procedure “Provision of construction supervision for the project “Reconstruction of the building of Substation 4, Abrenes iela 13, renewal of 10kV power lines and replacement of electrical equipment””
- Procurement procedure “Reconstruction of the building of Substation 4, Abrenes iela 13, renewal of 10kV power lines and replacement of electrical equipment”
- Open tender "Provision of construction supervision for the project "Adaption of the tram infrastructure to the low-floor tram parameters Tram Route 7.""
- Open tender "Provision of Construction Supervision for the Project "Adaptation of Tram Infrastructure to Low Floor Tram Parameters: Tram Route No. 5.""
- Open tender "Securing construction supervision at the site "Adaptation of the intersection of 11 November Embankment and 13 January Street to the low-floor tram parameters”
- Closed tender “Adaptation of tram infrastructure to the low-floor tram parameters. The intersection 11 November Embankment and 13 January Street.”
- Closed tender "Adaptation of the tram infrastructure to the low-floor tram parameters. Tram route No. 7"
- Closed tender "Adaptation of the tram infrastructure to the low-floor tram parameters. Tram route No. 5"
- Open tender “Purchase of the electrical equipment for substations”.
- Open tender “Adaptation of the tram infrastructure to the low-floor tram parameters. The intersection of 11. novembra krastmala and 13. janvāra Street “Construction project development and author's supervision”.
- Open tender “”Adaptation of the tram infrastructure to the low-floor tram parameters. Tram route No. 5. “Construction project development and author's supervision””
- Open tender “”Adaptation of the tram infrastructure to the low-floor tram parameters. Tram route No. 7. “Construction project development and author's supervision””